Skip to content
Logo
  • English
    • German

Alpha direct Balance Switch NFC base station

  • Register description
  • Automatic hydraulic balancing

FAQ: Alpha direct Balance / Balance Switch / Modbus

  • Is the OEM Alpha direct Balance System compatible with other thermostat components with their own controls?
  • Does the OEM Alpha direct base station need to be calibrated?
  • Do circuit control valves or other balancing devices need to be fitted to the distribution network?
  • Are flow indicators still required for the OEM Alpha direct Balance System?

FAQ: Alpha Direct base stations

  • Valve protection
  • Bypassing heating zones
  • Boiler control system
  • Switching between heating and cooling
  • Cooling application
  • Compatibility
  • Does the Alpha direct Balance base station replace conventional, manual hydraulic balancing?

Alpha direct Balance Downloads

  • Alpha direct Balance Downloads
  • Alpha direct Balance Downloads
  • Alpha direct Balance Switch Downloads
  • Certificates
  • Data sheets
View Categories
  • Systemauswahl
  • Alpha direct base station
  • Alpha direct Balance Switch / Switch Modbus NFC base station
  • Montage

Montage

  1. Take off the cover.
  2. Install the base. In case of wall mounting, fix the base to the wall with 2 screws Ø 4 mm and corresponding dowels according to the quality of the wall. In case of installation on a mounting bracket, use a bracket TS 35/7.5.
  3. Wire the electrical connections.
  4. Carefully mount the cover. Make sure that the bend of the NFC antenna is close to the lid.
  5. Switch on the supply voltage.

Updated on September 14, 2026
Electric connectionDevice overview

© 2024 | 300724

  • Supportrequest
  • Privacy Statement
  • Imprint
  • Supportrequest
  • Privacy Statement
  • Imprint