Skip to content
Logo
  • English
    • German

Alpha direct Balance base station - EN

  • Intended use
  • Device overview
  • Montage
  • Electric connection
  • LED signaling
  • Commissioning mode
  • Automated hydraulic balancing
  • Maintenance
  • Disassembly

Balance NFC app

  • Requirements for using NFC
  • Privacy policy
  • App functions
  • Download the app

Automatic hydraulic balancing AD EN

  • How it works
  • A practical guide for technicians: Hydraulic balancing using automated systems

Alpha direct Balance Switch base station EN

  • Compatibility
  • Hydraulic balancing remains necessary
  • Automatic heat distribution
  • Flow limiter not required
  • Cross-distribution network balancing required
  • Intended use
  • Device overview
  • Montage
  • Electric connection
  • LED signaling
  • Commissioning mode
  • Automated hydraulic balancing
  • Maintenance
  • Disassembly
  • Balance NFC app
View Categories
  • Systemauswahl
  • Alpha direct
  • Alpha direct Balance base station - EN
  • Maintenance

Maintenance

Change fuse #

Warning! Electrical voltage! Danger to life!
Before opening, de-energize the base and secure it against re-energization.
Disconnect any external voltages connected to the unit and secure it against accidental re-energization.
Determine the cause of the fuse failure.

Cleaning #

Use a dry, solvent-free, soft cloth for cleaning.

Updated on September 14, 2026
DisassemblyCommissioning mode